Your whole kitchen, ripped out and rebuilt. Every number fixed before we start.
Stripped. Back to brick by Friday, skip gone.
First fix. Every cable and pipe where the plan says.
Plaster. Walls go pink, then we leave them alone.
Floor and boxes. Floor poured, carcasses up.
Fronts, then stone. Doors on, island in, worktops and oven fitted.
Handover. You cook. The last 10% is due only when you sign.
Back to brick by Friday, skip gone.
Family kitchen, in writing, before we touch a wall.
$250 to you, every working day past day 42.
397 of 412 kitchens handed over by day 42. The other 15 cost us $9,250, and we paid it.
We open up the suspect walls during the measure. Anything we miss after you sign is ours. That line in the table says $0 for a reason.
A temporary kitchen goes in on day one: sink, two-ring hob and fridge, in whichever room you pick. It is in the price.
Five door colours and three stones, on your table at the measure. Picking from that list never moves the price. Anything off it is priced as its own line before you sign.
Pick a day. We bring the laser and leave the price in writing, about 45 minutes.
412 kitchens since 2019.
397 handed over by day 42.